The Quarter at Tropicana, Atlantic City, NJ

 

Armen Site Improvements
Date Submitted: 07/10/2008

Project Status : Bidding

Area = 120,928 SF (only portion between Ridge Pike and fence line).

Clean and Prep existing paving.

Remove loose materials.

Haul off debris.

Apply tack coat.

Apply 1-1/2” of topping.

Work to take place in September 2008.

Owner will remain in operation – plan on 2 phases.


 

Bryn Mawr Hospital Interventional Radiology
Date Submitted: 06/19/2008

Project Status : Bidding

Demolition, Floor Prep, Unistrut, Carpentry, Millwork, Doors/Frames/Hardware, Glass, Drywall, Paint, Flooring, Lead Protection, Fire Protection, Plumbing, HVAC, Electrical


 

Bryn Mawr Hospital Lab Renovation
Date Submitted: 06/11/2008

Project Status : Bidding

Renovations to the existing grossing lab, staff offices and installation of new equipment in the Rapid Response Lab.  There are multiple phases and some off hours work (see Sheet A1 for details).


 

Egg Harbor Township High School
Date Submitted: 07/14/2008

Project Status :

 

Password for this project is: nj

Approx. 87,000 sf of New Construction, including office space, classrooms, science rooms, auditorium, cafeteria, and kitchen, accompanied by 33,600 sf of renovation space and minor site work.


 

Foxwoods Casino-Core & Shell
Date Submitted: 05/28/2008

Project Status : Bidding

You are cordially invited to submit a proposal for the ­­­­­above project.  We have attached for your review the schedule of Bid Packages and a brief description of each.  In responding to this invite please indicate which BP you will be bidding.  For MEP please indicate if you are bidding the Garage or Casino (Core & Shell) or both.

 

Sealed Bids are due June 19th, 2008 at 2:00 pm in T N Ward's office.  Prebid will be on 5/29/08-9:00 a.m. at the Spectrum.

 

We will forward an RFP with instructions including scope of work, bid form, licensing and contract terms.  Additionally, the RFP will advise each bidder on the MBE/WBE/DBE and employment requirements. 

 

The steel, piles & precast are under contract and scheduled to be released in July.  The balance of the work will be released November 1st, 2008.  Detailed schedule will be in the RFP.  Generally the Casino & Garage are an 18 month project, starting November 1st, 2008. 

 

No interior fitout of the Casino is included in this bid only skin, roof & MEP Core & Shell.

 

 


 

Hyundai Rotem Phase 1A
Date Submitted: 05/14/2008

Project Status : Re Bidding with Addenda

Scope of Work: Provide equipment, labor, material, and supervision to complete construction of Interior Renovations; Floor and Pile System in accordance to the Burns Plans and Specifications. It is the contractor’s responsibility to ensure compliance with requirements briefed at the pre-construction meeting and all work to be complete in accordance to all local, state and federal codes and regulations.(i.e.: Environmental, Safety, Fire Department, security, etc.) The quote shall include cost for all permits and associated fees.

 

Some of the areas of the building may contain lead and / or other hazardous

materials. These materials shall be removed, stored, transported and disposed in

strict accordance withal state, local, and federal regulations. Hazardous material

disposal will coordinated through Burns and Hyundai Rotem USA.


 

Hyundia Rotem Phase A Package A2
Date Submitted: 04/24/2008

Project Status : Waiting for Results

Interior Renovations including General Construction, Electrical and Mechanical Work.  Work includes:  Select demolition, rails & tracks, concrete, masonry, stell and misc. metals, carpentry, doors/frames/hardware, drywall & framing, painting, toilet compartments, toilet accessories, lockers, fire protection, plumbing, compressed air, HVAC, electrical.


 

New Addition at Ivy Residence II
Date Submitted: 06/11/2008

Project Status : Bidding

You are cordially invited to submit a proposal for the work of your trade, in accordance with the Plans and Specifications prepared by Schwam Architects.  Please be sure to review the Wage Rates and Affirmative Action Requirements.


 

Salvation Army (Ray & Joan Kroc Center)
Date Submitted: 07/09/2008

Project Status : Bidding

 

PASSWORD IS: kroc

Structural steel for 2 story, 130,000 SF building.      


 

 

 

 
Ardmore, PA